Skip to main content

Floodplain

Floodplain

Brazoria County Floodplain
The Purpose of the Brazoria County Floodplain/Building Permits Department office is to help the citizens of this County when purchasing property for development and to help educate and enforce Floodplain Management. Building permits are mandatory for any construction project that meets this criteria. You are required to obtain a building permit in Brazoria County for structures over 200 square feet in a Non-Flood Zone and structures of any size in a Flood Zone that are completely enclosed. A building permit is required for additions, repairs, or renovations when the cost of the work equals or exceeds 50% of the present market value of the existing structure (excluding the land). If a structure located in a Special Flood Hazard Area (SFHA) is remodeled, expanded, or repaired after damage (such as from a flood or storm) and the cost equals or exceeds 50% of the structure's market value (excluding the land), the entire structure must be brought into full compliance with current floodplain management regulations—which typically requires elevating the lowest floor to meet local height mandates (2 feet above the base flood elevation).

We first determine if the property is located in a flood hazard area designated by FEMA by the site address. The next step is to determine the flood elevation for new structures based on the FEMA data. If the structure is located in a flood zone the elevation to be set at 2 feet above the base flood elevation. If the property is not located in a flood hazard area, the requirement will be required to be 2 feet above the highest adjacent grade. These codes are a minimum standard, protecting life, health, property and public welfare.

To monitor compliance, the Floodplain Permitting Department is responsible for permitting all development as defined in the Floodplain Regulations, as well as researching existing structures to grandfather or permit. The Floodplain Permitting Department also maintains current and historical FEMA Firm maps to make flood zone determinations. Brazoria County issued the first building permit for the unincorporated area in March 1975.

Flooded subdivision

Catalogue title


Days Hours
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
#todo masonry has to refresh after clicking photos tab
Article Details

Article Title

Job post

Position

Job Position

Bid details

Status:

Bid Title

Start date
Start:

End date
End:

Apply Now